Lake Johnston
A lower-capital pathway to production centred on an established processing facility.

Forrestania has established a lower-capital and lower-risk pathway to gold production through its wholly owned Lake Johnston Processing Facility. Acquired in February 2026, the established brownfield facility provides a compelling alternative to constructing a new greenfields processing plant.
Lake Johnston is being redeveloped as Forrestania's central processing hub, with the existing 1.5Mtpa nickel concentrator being refurbished and expanded to target gold-processing capacity of approximately 3.2Mtpa. The facility includes an established crushing and milling circuit, power and water infrastructure, workshops, laboratories, an airstrip and an accommodation camp, providing significant development, cost and scheduling advantages.
Refurbishment and operational-readiness activities are progressing across the crushing, milling, water and power systems, alongside construction of a new 10-tank CIL circuit and modular elution plant with an integrated gold room. Ore from British Hill is already being stockpiled onsite, with phased commissioning planned for early 2027. The operation is licensed to operate until 2041, providing a long-term processing base for Forrestania's growing Western Australian gold portfolio.
Together with Edna May, Lake Johnston will underpin Forrestania's dual-hub processing strategy, targeting combined processing capacity of more than 6Mtpa.
The dual-hub processing network.