Westonia Hub

Burracoppin

Project overview

A strategic near-mill gold resource

Burracoppin is a gold resource project within Forrestania's Westonia Hub, approximately 20km east of Merredin and 27km west of the Company's Edna May Gold Mine and processing facility. The project straddles the Great Eastern Highway and includes numerous historical prospecting pits, shallow shafts and costeans.

The project hosts a JORC Code (2012) compliant Inferred Mineral Resource of 2.015 million tonnes at 0.91g/t Au for 58,700 ounces of gold, reported at a 0.5g/t Au cut-off grade. The Mineral Resource extends across approximately 3km of strike and comprises the Benbur-Christmas Gift, Easter Gift and Lone Tree zones.

Gold mineralisation occurs in narrow, steeply dipping north-south striking veins and is associated with quartz-rich stringers hosted by pelitic sediments, mafic granulites, gabbroic and granitic rocks. The current estimate is informed by 155 reverse-circulation drill holes for 11,496m, including 69 holes completed by Askari Metals during 2021 and 2022.

Burracoppin's location near is near the Edna May processing facility. Forrestania has identified further resource extension drilling along strike and down dip, together with diamond core drilling for metallurgical testwork, as the next steps to assess opportunities to grow and improve the resource.

Project map and resource

Burracoppin Tenement and Drilling Map

Mineral Resource Estimate

Burracoppin — Mineral Resource Estimate
ClassificationAu cut-off (g/t)TonnesGrade (g/t Au)Contained gold (oz)
Inferred (>=0.5g/t Au)2,015,0000.9158,700
Total2,015,0000.9158,700

Note: The Mineral Resource Estimate is reported in accordance with the JORC Code (2012) at a 0.5g/t Au cut-off grade. Figures may not add precisely due to rounding.

ReferenceBurracoppin Mineral Resource Estimate